اللغة العربية - الترجمة الآلية
تحديث الإصدار 195746
البريد الإلكتروني
تأكيد الأمر لمادة الحد المحسَّن وبنود الخدمة
معرف الميزة

CSC-21608

Feature Description

With this feature, suppliers can create confirmations for enhanced-limit service and material line items in a purchase order. Suppliers can edit the service start and end dates, and update the expected value.

Customer Problem

Order confirmation for lean services and materials in Ariba Network doesn’t currently support the concept of enhanced limits, which comprises the expected limit and overall limit. The expected limit is monetary value that the *unplanned* services (or the material) covered by the item are not expected to exceed. It is a figure buyer assumes to be the final amount payable. The overall limit in turn holds the maximum value that the total of all *unplanned* services (or the value of the material) covered by the item may not exceed.

Customer Value Proposition

With confirmation for enhanced limits, customers are able to know whether a supplier received the order and if they agree with the expected value, and start-end date of the service sent in the PO or if they need to adjust them.

Audience

Buyer and Supplier

What's New Guide

https://help.sap.com/docs/SAP_Ariba/978b7e36451a4c2c85321a3ef6f3a7e5/c2d598c4e9b448d9b32ffadaae1b45ce.html?locale=en-US&state=PRODUCTION&version=cloud

Feature Enablement

Automatically On

تمت ترجمة مقال قاعدة المعرفة هذا آليًا تسهيلاً لك. ولا تقدم SAP أي ضمان فيما يتعلق بصحة الترجمة الآلية أو اكتمالها. ويمكنك العثور على المحتوى الأصلي عن طريق التبديل إلى اللغة الإنجليزية باستخدام محدد اللغة.
الحلول القابلة للتطبيق

Ariba Network

المتطلبات الأساسية

تتطلب هذه الميزة تمكين أحد الحقوق التالية:

القيود

لم يتم تحديد أي شيء


تنطبق على

SAP Business Network 2105

شروط الاستخدام  |  حقوق النشر  |  إفصاح حماية الأمان  |  الخصوصية